ITAC Assessment: AM0948
ITAC logo
ITAC Assessment: AM0948
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Thermoplastic pellets and stock
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 300,000
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $618,306 17,205,093
kWh
Electricity Demand $364,052 48,535
kW-mo/yr
Electricity Fees $13,932 -
Natural Gas $165,213 51,636
MMBtu
Waste Disposal Costs
Water Disposal $5,050 1
Tgal
TOTAL YEARLY COSTS $1,166,553
RECOMMENDED SAVINGS* $72,927 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $64,600 $158,000 - $64,600
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,600 $19 $4,870
135,000
kWh
$1,730
-
kW-mo/yr
-
03 2.4314: Use synthetic lubricant $1,275 $375 $943
26,200
kWh
$332
-
kW-mo/yr
-
04 2.1241: Reduce excessive boiler blowdown $452 $228 - - $452
-
MMBtu
TOTAL RECOMMENDED $72,927 $158,622 $5,813
161,200
kWh
$66,662
-
kW-mo/yr
$452
-
MMBtu
TOTAL IMPLEMENTED - - - - -