ITAC Assessment: AM0942
ITAC logo
ITAC Assessment: AM0942
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product cleaned semiconductors
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 120,000
ft2
Annual Production 328,500
units
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,274 7,286,277
kWh
Electricity Demand $134,997 11,280
kW-mo/yr
Electricity Fees $46,502 -
Natural Gas $19,366 1,835
MMBtu
Waste Disposal Costs
Water Usage $63,912 11,193
Tgal
TOTAL YEARLY COSTS $564,051
RECOMMENDED SAVINGS* $229,081 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $189,590 $15,000 - - $37,918 - - $151,672
02 2.9114: Use solar heat to make electricty $15,120 $137,270 $15,120
159,316
kWh
- - - - -
03 3.4116: Meter recycled water (to reduce sewer charges) $12,400 - - - - - $12,400 -
04 2.7492: Use proper thickness of insulation on building envelope $6,250 $42,340 $4,470
108,940
kWh
$1,780
-
kW-mo/yr
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,970 $10,150 $2,970
72,480
kWh
- - - - -
06 3.4113: Treat and reuse rinse waters $1,240 $350 - - - $1,240
-
Tgal
- -
07 2.7135: Install occupancy sensors $1,037 $376 $1,037
25,229
kWh
- - - - -
08 2.6218: Turn off equipment when not in use $474 - $474
1,500
kWh
- - - - -
TOTAL RECOMMENDED $229,081 $205,486 $24,071
367,465
kWh
$1,780
-
kW-mo/yr
$37,918 $1,240
-
Tgal
$12,400 $151,672
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs