ITAC Assessment: AM0940
ITAC logo
ITAC Assessment: AM0940
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Sheet metal formed parts, precision milled and turned parts, wire and sinker EDM services, welded fabrications, plastic injection molded parts and powder coating
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 43,000
ft2
Annual Production 515,000
units
Production Hrs. Annual 4,118
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,910 1,151,830
kWh
Electricity Demand $40,494 3,961
kW-mo/yr
LPG $3,720 128
MMBtu
Waste Disposal Costs
Water Usage $2,842 431
Tgal
TOTAL YEARLY COSTS $114,966
RECOMMENDED SAVINGS* $73,253 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $31,215 $3,595,220 $31,215
529,076
kWh
- -
02 2.7232: Replace existing hvac unit with high efficiency model $11,689 $569,500 $1,231
20,862
kWh
$458
-
kW-mo/yr
$10,000
03 2.4322: Use or replace with energy efficient substitutes $11,683 $5,100 $11,683
198,020
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,290 $32,500 $4,520
76,570
kWh
$1,770
-
kW-mo/yr
-
05 2.3212: Optimize plant power factor $1,376 $3,623 - $1,376
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $275 $480 $275
4,660
kWh
- -
07 2.8121: Apply for tax-free status for energy purchases $10,725 - - - $10,725
TOTAL RECOMMENDED $73,253 $4,206,423 $48,924
829,188
kWh
$3,604
-
kW-mo/yr
$20,725
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs