ITAC Assessment: AM0921
ITAC logo
ITAC Assessment: AM0921
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product School students
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area 55,600
ft2
Annual Production 100
units
Production Hrs. Annual 3,209
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,526 386,112
kWh
Electricity Demand $33,642 2,540
kW-mo/yr
Natural Gas $6,753 633
MMBtu
TOTAL YEARLY COSTS $55,921
RECOMMENDED SAVINGS* $17,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.5123: Reduce fluid flow rates $787 $3,000 $787
18,380
kWh
- -
02 2.9114: Use solar heat to make electricty $14,420 $260,520 $10,420
243,449
kWh
$4,000
-
kW-mo/yr
-
03 2.1132: Repair faulty louvers and dampers $2,461 $6,000 $82
1,906
kWh
- $2,379
-
MMBtu
04 2.7135: Install occupancy sensors $218 $3,540 $99
2,312
kWh
$119
-
kW-mo/yr
-
TOTAL RECOMMENDED $17,886 $273,060 $11,388
266,047
kWh
$4,119
-
kW-mo/yr
$2,379
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs