ITAC Assessment: AM0918
ITAC logo
ITAC Assessment: AM0918
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product School students
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range $1
M
to 5
M
# of Employees 34
Plant Area 57,033
ft2
Annual Production 110
units
Production Hrs. Annual 3,377
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,927 735,296
kWh
Electricity Demand $48,205 3,636
kW-mo/yr
Natural Gas $5,831 528
MMBtu
TOTAL YEARLY COSTS $88,963
RECOMMENDED SAVINGS* $30,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.5123: Reduce fluid flow rates $1,310 $3,000 $1,310
27,570
kWh
- -
02 2.9114: Use solar heat to make electricty $25,377 $489,840 $20,565
432,950
kWh
$4,812
-
kW-mo/yr
-
03 2.1132: Repair faulty louvers and dampers $412 $3,000 $14
300
kWh
- $398
-
MMBtu
04 2.7135: Install occupancy sensors $2,244 $1,215 $520
10,941
kWh
$1,724
-
kW-mo/yr
-
05 2.2625: Chill water to the highest temperature possible $1,601 $3,000 $201
4,227
kWh
- $1,400
-
MMBtu
TOTAL RECOMMENDED $30,944 $500,055 $22,610
475,988
kWh
$6,536
-
kW-mo/yr
$1,798
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs