ITAC Assessment: AM0917
ITAC logo
ITAC Assessment: AM0917
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Elementary School Students
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 62,000
ft2
Annual Production 100
units
Production Hrs. Annual 3,377
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,322 577,728
kWh
Electricity Demand $46,020 3,489
kW-mo/yr
Natural Gas $7,434 1,140
MMBtu
TOTAL YEARLY COSTS $77,776
RECOMMENDED SAVINGS* $22,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 3.4154: Eliminate leaks in water lines and valves $362 $3,000 $105
2,485
kWh
- $257
-
MMBtu
02 2.9114: Use solar heat to make electricty $21,840 $468,000 $18,324
435,249
kWh
$3,516
-
kW-mo/yr
-
03 2.7212: Install or upgrade insulation on hvac distribution systems $21 $300 - - $21
-
MMBtu
04 2.7135: Install occupancy sensors $77 $1,470 $36
866
kWh
$41
-
kW-mo/yr
-
TOTAL RECOMMENDED $22,300 $472,770 $18,465
438,600
kWh
$3,557
-
kW-mo/yr
$278
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs