ITAC Assessment: TA0018
ITAC logo
ITAC Assessment: TA0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Business Forms
NAICS
n/a
SIC 2764:
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 51,000
ft2
Annual Production 2,603
units
Production Hrs. Annual 6,384
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,550 2,728,227
kWh
Electricity Demand $55,690 6,847
kW-mo/yr
Electricity Fees $7,508 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $3,925 - n/a $3,925
108,851
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,620 $1,400 n/a $960
26,660
kWh
$660
-
kW-mo/yr
03 2.4314: Use synthetic lubricant $1,460 - n/a $865
23,980
kWh
$595
-
kW-mo/yr
04 2.6212: Turn off equipment during breaks, reduce operating time $1,070 - n/a $1,070
29,750
kWh
-
05 2.7124: Make a practice of turning off lights when not needed $700 - n/a $700
19,340
kWh
-
06 2.6242: Minimize operation of equipment maintained in standby condition $645 - n/a - $645
-
kW-mo/yr
07 2.2511: Insulate bare equipment $230 $20 n/a $230
6,450
kWh
-
TOTAL RECOMMENDED $9,650 $1,420 $7,750
215,031
kWh
$1,900
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs