ITAC Assessment: AM0890
ITAC logo
ITAC Assessment: AM0890
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product No contact control accessed boxes and cards
NAICS 334515: Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
SIC 3669: Communications Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 250,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,109
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $451,080 7,206,000
kWh
Electricity Demand $227,013 15,412
kW-mo/yr
Electricity Fees $27,355 -
TOTAL YEARLY COSTS $705,448
RECOMMENDED SAVINGS* $40,642 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.2211: Use optimum temperature $12,180 - $12,230
195,300
kWh
- - $(-50.0)
02 2.4239: Eliminate or reduce compressed air usage $10,660 $2,690 $10,660
170,300
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,090 $1,000 $7,630
121,900
kWh
$2,460
-
kW-mo/yr
- -
04 2.8123: Pay utility bills on time $2,933 - - - $2,933 -
05 2.6218: Turn off equipment when not in use $2,310 - $2,310
36,890
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,790 $18 $1,390
22,200
kWh
$400
-
kW-mo/yr
- -
07 2.4314: Use synthetic lubricant $350 $200 $240
3,800
kWh
$110
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $240 $480 $240
3,830
kWh
- - -
09 2.7124: Make a practice of turning off lights when not needed $89 $38 $74
1,180
kWh
$15
-
kW-mo/yr
- -
TOTAL RECOMMENDED $40,642 $4,426 $34,774
555,400
kWh
$2,985
-
kW-mo/yr
$2,933 $(-50.0)
TOTAL IMPLEMENTED $22,780 $4,188 $19,920
318,230
kWh
$2,860
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs