IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product oilfield tubular threads
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 150,000
ft2
Annual Production 360,000
units
Production Hrs. Annual 7,296
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,994 4,286,314
kWh
Electricity Demand $48,950 12,931
kW-mo/yr
Electricity Fees $66,411 -
Natural Gas $95,384 11,628
MMBtu
TOTAL YEARLY COSTS $415,739
RECOMMENDED SAVINGS* $51,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,402

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4314: Use synthetic lubricant $1,823 - $261
5,546
kWh
$1,562
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,373 $63 $3,023
64,323
kWh
$1,350
-
kW-mo/yr
03 2.4239: Eliminate or reduce compressed air usage $25,280 $4,875 $25,280
537,900
kWh
-
04 2.3212: Optimize plant power factor $20,029 $25,217 - $20,029
-
kW-mo/yr
TOTAL RECOMMENDED $51,505 $30,155 $28,564
607,769
kWh
$22,941
-
kW-mo/yr
TOTAL IMPLEMENTED $24,402 $25,280 $3,023
64,323
kWh
$21,379
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs