ITAC Assessment: AM0861
ITAC logo
ITAC Assessment: AM0861
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Bread & rolls
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 147,000
ft2
Annual Production 68,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $370,541 6,959,009
kWh
Electricity Demand $116,329 14,325
kW-mo/yr
Electricity Fees $53,415 -
Natural Gas $218,596 34,091
MMBtu
TOTAL YEARLY COSTS $758,881
RECOMMENDED SAVINGS* $278,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $260,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $238,650 $7,000 - - $47,730 - $190,920
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,100 $9,940 $12,330
216,400
kWh
$3,040
-
kW-mo/yr
- $(-270.0) -
03 2.3212: Optimize plant power factor $18,300 $41,680 - $18,300
-
kW-mo/yr
- - -
04 2.4239: Eliminate or reduce compressed air usage $3,960 $460 $3,960
69,570
kWh
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,870 $13 $1,570
27,500
kWh
$300
-
kW-mo/yr
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $700 - $570
9,930
kWh
$130
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $101 $214 $101
1,770
kWh
- - - -
TOTAL RECOMMENDED $278,681 $59,307 $18,531
325,170
kWh
$21,770
-
kW-mo/yr
$47,730 $(-270.0) $190,920
TOTAL IMPLEMENTED $260,280 $17,413 $18,430
323,400
kWh
$3,470
-
kW-mo/yr
$47,730 $(-270.0) $190,920
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs