ITAC Assessment: AM0858
ITAC logo
ITAC Assessment: AM0858
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product doctor visits
NAICS 621111: Offices of Physicians (except Mental Health Specialists)
SIC 8011: Offices and Clinics of Doctors of Medicine
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 128,961
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 4,300
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,847 2,079,360
kWh
Electricity Demand $71,283 5,534
kW-mo/yr
TOTAL YEARLY COSTS $151,130
RECOMMENDED SAVINGS* $48,698 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $34,075 $110,044 $16,005
416,798
kWh
$18,070
-
kW-mo/yr
02 2.7224: Reduce space conditioning during non-working hours $8,689 $45,000 $3,814
99,355
kWh
$4,875
-
kW-mo/yr
03 2.7221: Lower temperature during the winter season and vice-versa $2,243 $11,600 $1,529
39,809
kWh
$714
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,656 $8,400 $1,656
43,133
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,035 $10,000 $2,035
52,997
kWh
-
TOTAL RECOMMENDED $48,698 $185,044 $25,039
652,092
kWh
$23,659
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs