ITAC Assessment: AM0856
ITAC logo
ITAC Assessment: AM0856
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Air conditioning equipment
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 125,000
ft2
Annual Production 12,173
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,450 2,548,492
kWh
Electricity Fees $3,343 -
Natural Gas $5,966 552
MMBtu
Waste Disposal Costs
Water Usage $19,643 1,661
Tgal
TOTAL YEARLY COSTS $228,402
RECOMMENDED SAVINGS* $31,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,035 $2,100 $8,350
107,000
kWh
$3,685
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $9,360 - $9,360
120,000
kWh
- -
03 2.7124: Make a practice of turning off lights when not needed $4,410 $1,000 $4,410
56,530
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,745 $2,528 $1,915
24,554
kWh
$830
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,790 $2,520 $1,790
22,960
kWh
- -
06 2.4239: Eliminate or reduce compressed air usage $675 $1,275 $675
8,640
kWh
- -
07 2.8123: Pay utility bills on time $545 - - - $545
TOTAL RECOMMENDED $31,560 $9,423 $26,500
339,684
kWh
$4,515
-
kW-mo/yr
$545
TOTAL IMPLEMENTED $13,770 $1,000 $13,770
176,530
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs