ITAC Assessment: AM0830
ITAC logo
ITAC Assessment: AM0830
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Aerospace wiring systems harnesses
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 604
Plant Area 120,000
ft2
Annual Production 38,000
pieces
Production Hrs. Annual 2,192
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,251 2,551,944
kWh
Electricity Demand $68,318 6,324
kW-mo/yr
Electricity Fees $851 -
Waste Disposal Costs
Water Usage $2,217 372
Tgal
Water Disposal $2,112 372
Tgal
TOTAL YEARLY COSTS $219,749
RECOMMENDED SAVINGS* $22,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,950

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $11,150 - $11,800
226,300
kWh
- $(-650.0) -
02 2.3212: Optimize plant power factor $4,020 $16,040 - $4,020
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $2,300 $25 $1,770
34,000
kWh
$530
-
kW-mo/yr
- -
04 2.7134: Use photocell controls $2,760 $460 $1,720
33,100
kWh
$1,040
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,740 $1,170 $370
7,140
kWh
$110
-
kW-mo/yr
$820 $1,440
TOTAL RECOMMENDED $22,970 $17,695 $15,660
300,540
kWh
$5,700
-
kW-mo/yr
$170 $1,440
TOTAL IMPLEMENTED $18,950 $1,655 $15,660
300,540
kWh
$1,680
-
kW-mo/yr
$170 $1,440
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs