Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Oil & Gas process equipment
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 155,000
ft2
Annual Production 400
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,593 1,217,520
kWh
Electricity Demand $72,248 8,121
kW-mo/yr
Electricity Fees $797 -
Natural Gas $31,348 4,609
MMBtu
Waste Disposal Costs
Water Usage $9,088 1,118
Tgal
TOTAL YEARLY COSTS $173,074
RECOMMENDED SAVINGS* $53,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,600 $3,400 $3,700
87,000
kWh
$4,900
-
kW-mo/yr
- - -
02 2.8121: Apply for tax-free status for energy purchases $10,940 $15,000 - - $10,940 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,370 $30,000 $2,600
66,000
kWh
$1,300
-
kW-mo/yr
- $2,800 $(-330.0)
04 2.3212: Optimize plant power factor $21,250 $22,150 - $21,250
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,070 $2,117 $400
9,350
kWh
$600
-
kW-mo/yr
- - $70
06 2.7124: Make a practice of turning off lights when not needed $75 $152 $30
720
kWh
$45
-
kW-mo/yr
- - -
07 2.6218: Turn off equipment when not in use $5,200 $1,350 $5,200
123,700
kWh
- - - -
TOTAL RECOMMENDED $53,505 $74,169 $11,930
286,770
kWh
$28,095
-
kW-mo/yr
$10,940 $2,800 $(-260.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs