ITAC Assessment: AM0817
ITAC logo
ITAC Assessment: AM0817
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Wire rope and slings
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 90,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 2,750
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,141 792,960
kWh
Electricity Demand $19,297 3,442
kW-mo/yr
Electricity Fees $9,194 -
TOTAL YEARLY COSTS $62,632
RECOMMENDED SAVINGS* $57,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $23,040 $20,000 - - - $23,040 - -
02 2.3212: Optimize plant power factor $4,170 $12,500 - $4,170
-
kW-mo/yr
- - - -
03 2.8121: Apply for tax-free status for energy purchases $19,400 $3,000 - - $3,880 - - $15,520
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $2,950 $200 - - - - $2,950 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,690 $8,520 $1,540
35,900
kWh
$1,120
-
kW-mo/yr
- - $30 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,950 $2,820 $1,140
26,330
kWh
$520
-
kW-mo/yr
- - $290 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,720 $800 $1,000
23,200
kWh
$720
-
kW-mo/yr
- - - -
08 2.7135: Install occupancy sensors $1,210 $140 $1,210
28,140
kWh
- - - - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $340 $10 $210
4,870
kWh
$130
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $57,470 $47,990 $5,100
118,440
kWh
$6,660
-
kW-mo/yr
$3,880 $23,040 $3,270 $15,520
TOTAL IMPLEMENTED $3,030 $8,530 $1,750
40,770
kWh
$1,250
-
kW-mo/yr
- - $30 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs