ITAC Assessment: AM0811
ITAC logo
ITAC Assessment: AM0811
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Steel utility poles
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 316
Plant Area 250,000
ft2
Annual Production 15,600
ton
Production Hrs. Annual 6,192
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $684,909 10,413,600
kWh
Electricity Fees $8,161 -
Natural Gas $132,804 27,237
MMBtu
Waste Disposal Costs
Water Usage $14,758 1,636
Tgal
TOTAL YEARLY COSTS $840,632
RECOMMENDED SAVINGS* $52,679 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,779

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.7111: Reduce illumination to minimum necessary levels $19,123 $20,000 $19,123
289,748
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,800 $6,000 $16,800
254,000
kWh
-
03 2.8123: Pay utility bills on time $7,866 - - $7,866
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,900 $60 $5,900
89,500
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,530 $255 $2,530
38,400
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $460 $200 $460
7,010
kWh
-
TOTAL RECOMMENDED $52,679 $26,515 $44,813
678,658
kWh
$7,866
TOTAL IMPLEMENTED $46,779 $26,455 $38,913
589,158
kWh
$7,866
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs