| Assessment Year | 2021 |
|---|---|
| Principal Product | Steel utility poles |
| NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
| SIC | 3533: Oil and Gas Field Machinery and Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 316 |
| Plant Area |
250,000
ft2
|
| Annual Production | 15,600
ton
|
| Production Hrs. Annual | 6,192
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $684,909 | 10,413,600 |
kWh
|
$0.066 | |
| Electricity Fees | $8,161 | - |
|
- | |
| Natural Gas | $132,804 | 27,237 |
MMBtu
|
$4.88 | |
| Waste Disposal Costs | |||||
| Water Usage | $14,758 | 1,636 |
Tgal
|
$9.02 | |
| TOTAL YEARLY COSTS | $840,632 | ||||
| RECOMMENDED SAVINGS* | $52,679 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $46,779 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $19,123 | $20,000 |
$19,123
289,748
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,800 | $6,000 |
$16,800
254,000
kWh
|
- | |
| 03 | 2.8123: Pay utility bills on time | $7,866 | - | - | $7,866 | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,900 | $60 |
$5,900
89,500
kWh
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,530 | $255 |
$2,530
38,400
kWh
|
- | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $460 | $200 |
$460
7,010
kWh
|
- | |
| TOTAL RECOMMENDED | $52,679 | $26,515 |
$44,813
678,658
kWh
|
$7,866 | ||
| TOTAL IMPLEMENTED | $46,779 | $26,455 |
$38,913
589,158
kWh
|
$7,866 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs