Assessment Year | 2021 |
---|---|
Principal Product | wood fiber products |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
52,500
ft2
|
Annual Production | 66,000
thousand feet
|
Production Hrs. Annual | 2,224
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $34,050 | 587,310 |
kWh
|
$0.058 |
Electricity Demand | $35,780 | 4,924 |
kW-mo/yr
|
$7.27 |
Electricity Fees | $(-234.0) | - |
|
- |
TOTAL YEARLY COSTS | $69,596 | |||
RECOMMENDED SAVINGS* | $14,835 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,835 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $5,200 | $1,000 | - | - | $5,200 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,320 | $1,680 |
$2,020
34,800
kWh
|
$1,300
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,410 | $180 |
$3,410
58,830
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,245 | $2,670 |
$1,045
18,050
kWh
|
$1,200
-
kW-mo/yr
|
- | |
05 | 2.8114: Change rate schedules or other changes in utility service | $370 | $50 | - | - | $370 | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $290 | $20 |
$160
2,825
kWh
|
$130
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $14,835 | $5,600 |
$6,635
114,505
kWh
|
$2,630
-
kW-mo/yr
|
$5,570 | ||
TOTAL IMPLEMENTED | $14,835 | $5,600 |
$6,635
114,505
kWh
|
$2,630
-
kW-mo/yr
|
$5,570 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs