Assessment Year | 2020 |
---|---|
Principal Product | Metal investment castings |
NAICS | 331512: Steel Investment Foundries |
SIC | 3324: Steel Investment Foundries |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
36,000
ft2
|
Annual Production | 5,000,000
ton
|
Production Hrs. Annual | 4,536
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $251,370 | 3,003,650 |
kWh
|
$0.084 |
Electricity Demand | $61,194 | 10,637 |
kW-mo/yr
|
$5.75 |
Natural Gas | $131,604 | 40,924 |
MMBtu
|
$3.22 |
TOTAL YEARLY COSTS | $444,168 | |||
RECOMMENDED SAVINGS* | $19,270 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,880 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,690 | $1,000 |
$5,660
67,400
kWh
|
$1,030
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,240 | $1,265 |
$4,240
50,500
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,735 | $9,030 |
$3,160
37,700
kWh
|
$575
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,875 | $2,660 |
$2,420
28,800
kWh
|
$455
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $1,150 | $420 |
$1,150
13,730
kWh
|
- | - | |
06 | 2.1113: Reduce combustion air flow to optimum | $580 | $300 | - | - |
$580
-
MMBtu
|
|
TOTAL RECOMMENDED | $19,270 | $14,675 |
$16,630
198,130
kWh
|
$2,060
-
kW-mo/yr
|
$580
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,880 | $12,990 |
$11,240
133,900
kWh
|
$2,060
-
kW-mo/yr
|
$580
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs