ITAC Assessment: AM0800
ITAC logo
ITAC Assessment: AM0800
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product API tanks
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 73,800
ft2
Annual Production 1,040
pieces
Production Hrs. Annual 2,192
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,831 1,293,538
kWh
Electricity Demand $90,480 8,372
kW-mo/yr
Electricity Fees $4,296 -
Waste Disposal Costs
Solid Waste (non-haz) $23,000 26,000
lb
TOTAL YEARLY COSTS $175,607
RECOMMENDED SAVINGS* $494,843 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $494,843

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $487,100 $3,000 - - - $6,100
-
lb
$481,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,960 $2,460 $930
20,300
kWh
$1,030
-
kW-mo/yr
- - -
03 2.8123: Pay utility bills on time $2,148 - - - $2,148 - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,700 $267 $1,700
37,000
kWh
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,540 $40 $590
13,800
kWh
$950
-
kW-mo/yr
- - -
06 2.4314: Use synthetic lubricant $395 $150 $175
3,900
kWh
$220
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $494,843 $5,917 $3,395
75,000
kWh
$2,200
-
kW-mo/yr
$2,148 $6,100
-
lb
$481,000
TOTAL IMPLEMENTED $494,843 $5,917 $3,395
75,000
kWh
$2,200
-
kW-mo/yr
$2,148 $6,100
-
lb
$481,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs