ITAC Assessment: AM0798
ITAC logo
ITAC Assessment: AM0798
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Aluminum beverage cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 163
Plant Area 350,000
ft2
Annual Production 2,000,000,000
pieces
Production Hrs. Annual 8,688
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,460,363 45,636,370
kWh
Electricity Demand $880,560 90,967
kW-mo/yr
Electricity Fees $160,182 -
Natural Gas $380,043 106,305
MMBtu
Waste Disposal Costs
Water Usage $35 5
Tgal
TOTAL YEARLY COSTS $2,881,183
RECOMMENDED SAVINGS* $579,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $535,860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $336,600 - - - $168,300 $168,300
02 2.3212: Optimize plant power factor $126,730 $229,415 - $126,730
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $66,000 $20,000 $44,080
1,377,000
kWh
$21,920
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $31,045 $150 $20,735
648,000
kWh
$10,310
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,800 $4,680 $7,200
226,000
kWh
$3,600
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,120 $11,560 $3,420
107,000
kWh
$1,700
-
kW-mo/yr
- -
07 2.7124: Make a practice of turning off lights when not needed $1,955 - - $1,955
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,410 $1,570 $710
22,130
kWh
$700
-
kW-mo/yr
- -
TOTAL RECOMMENDED $579,660 $267,375 $76,145
2,380,130
kWh
$166,915
-
kW-mo/yr
$168,300 $168,300
TOTAL IMPLEMENTED $535,860 $262,545 $48,210
1,506,130
kWh
$151,050
-
kW-mo/yr
$168,300 $168,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs