ITAC Assessment: AM0793
ITAC logo
ITAC Assessment: AM0793
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Investment casting, precision machining
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 45
Plant Area 137,000
ft2
Annual Production 18,000
pieces
Production Hrs. Annual 4,124
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $409,811 5,839,900
kWh
Electricity Demand $84,919 15,162
kW-mo/yr
Electricity Fees $14,839 -
Natural Gas $8,660 1,514
MMBtu
Waste Disposal Costs
Water Usage $17,769 2,194
Tgal
TOTAL YEARLY COSTS $535,997
RECOMMENDED SAVINGS* $151,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $151,643

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $122,230 $353,500 $9,290
138,600
kWh
$1,940
-
kW-mo/yr
- $111,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $19,281 $24,231 $15,796
235,766
kWh
$4,116
-
kW-mo/yr
$722 $(-1,353.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,008 $2,735 $1,008
15,047
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,270 $680 $335
5,010
kWh
$42
-
kW-mo/yr
$1,275 $1,618
05 2.7135: Install occupancy sensors $2,875 $4,200 $2,875
42,900
kWh
- - -
06 2.7124: Make a practice of turning off lights when not needed $923 $100 $729
10,876
kWh
$194
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,056 $1,000 $1,631
24,357
kWh
$425
-
kW-mo/yr
- -
TOTAL RECOMMENDED $151,643 $386,446 $31,664
472,556
kWh
$6,717
-
kW-mo/yr
$1,997 $111,265
TOTAL IMPLEMENTED $151,643 $386,446 $31,664
472,556
kWh
$6,717
-
kW-mo/yr
$1,997 $111,265
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs