ITAC Assessment: AM0792
ITAC logo
ITAC Assessment: AM0792
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Tire repair product packets
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area 58,300
ft2
Annual Production 16,800,000
pieces
Production Hrs. Annual 3,698
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,224 567,974
kWh
Electricity Fees $2,799 -
Natural Gas $34,198 4,539
MMBtu
Waste Disposal Costs
Water Usage $2,891 6
Tgal
Water Disposal $1,429 6
Tgal
TOTAL YEARLY COSTS $106,541
RECOMMENDED SAVINGS* $8,368 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,368

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $2,250 $2,000 - $450 - $1,800
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,230 $500 $2,230
20,220
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,122 $3,340 $2,920
26,600
kWh
- $202 -
04 2.7134: Use photocell controls $426 $150 $426
3,880
kWh
- - -
05 2.4314: Use synthetic lubricant $340 $100 $340
3,100
kWh
- - -
TOTAL RECOMMENDED $8,368 $6,090 $5,916
53,800
kWh
$450 $202 $1,800
TOTAL IMPLEMENTED $8,368 $6,090 $5,916
53,800
kWh
$450 $202 $1,800
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs