ITAC Assessment: AM0791
ITAC logo
ITAC Assessment: AM0791
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Plastic containers, buckets, and material handling products
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 108,000
ft2
Annual Production 36,000,000
pieces
Production Hrs. Annual 8,664
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,240,810 18,654,404
kWh
Electricity Demand $327,670 37,998
kW-mo/yr
Electricity Fees $47,631 -
Natural Gas $4,996 1,058
MMBtu
Waste Disposal Costs
Water Usage $25,152 6,293
Tgal
Water Disposal $29,904 6,293
Tgal
TOTAL YEARLY COSTS $1,676,163
RECOMMENDED SAVINGS* $384,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $380,485

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $282,870 $5,000 - - - $282,870 - -
02 2.8121: Apply for tax-free status for energy purchases $56,640 $5,000 - - - - - $56,640
03 2.3212: Optimize plant power factor $40,100 $66,545 - $40,100
-
kW-mo/yr
- - - -
04 2.7135: Install occupancy sensors $2,180 $1,670 $2,180
46,330
kWh
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,725 $2,590 $1,380
29,300
kWh
$320
-
kW-mo/yr
- - $25 -
06 2.8123: Pay utility bills on time $540 - - - $540 - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $335 $8 $275
5,900
kWh
$60
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $384,390 $80,813 $3,835
81,530
kWh
$40,480
-
kW-mo/yr
$540 $282,870 $25 $56,640
TOTAL IMPLEMENTED $380,485 $76,553 $275
5,900
kWh
$40,160
-
kW-mo/yr
$540 $282,870 - $56,640
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs