ITAC Assessment: AM0790
ITAC logo
ITAC Assessment: AM0790
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product wastewater treatment plant
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 3
Plant Area 3,000
ft2
Annual Production 547,500
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,513 825,564
kWh
Electricity Demand $14,645 1,601
kW-mo/yr
Electricity Fees $1,877 -
TOTAL YEARLY COSTS $59,035
RECOMMENDED SAVINGS* $20,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,541

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 3.1191: Change procedures / equipment / operating conditions $13,870 $29,400 $11,200
224,000
kWh
$2,670
-
kW-mo/yr
02 2.3212: Optimize plant power factor $4,100 $5,300 - $4,100
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,921 $12,100 $1,921
38,418
kWh
-
04 2.4314: Use synthetic lubricant $415 $510 $282
5,646
kWh
$133
-
kW-mo/yr
05 2.7134: Use photocell controls $235 $17 $160
3,180
kWh
$75
-
kW-mo/yr
TOTAL RECOMMENDED $20,541 $47,327 $13,563
271,244
kWh
$6,978
-
kW-mo/yr
TOTAL IMPLEMENTED $20,541 $47,327 $13,563
271,244
kWh
$6,978
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs