ITAC Assessment: AM0788
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Bolts and fasteners
NAICS 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 40,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 4,520
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,045 2,040,676
kWh
Electricity Demand $56,534 9,729
kW-mo/yr
Electricity Fees $15,436 -
Natural Gas $70,821 14,537
MMBtu
TOTAL YEARLY COSTS $248,836
RECOMMENDED SAVINGS* $30,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,810

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $10,300 $28,750 - $10,300
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,355 $1,000 $5,350
107,000
kWh
$2,005
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,200 $17,300 $4,950
99,000
kWh
$1,850
-
kW-mo/yr
- $400
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,125 $4,520 $2,085
41,700
kWh
$850
-
kW-mo/yr
- $190
05 2.8123: Pay utility bills on time $1,270 - - - $1,270 -
06 2.7132: Install timers on light switches in little used areas $860 $124 $620
12,400
kWh
$240
-
kW-mo/yr
- -
TOTAL RECOMMENDED $30,110 $51,694 $13,005
260,100
kWh
$15,245
-
kW-mo/yr
$1,270 $590
TOTAL IMPLEMENTED $19,810 $22,944 $13,005
260,100
kWh
$4,945
-
kW-mo/yr
$1,270 $590
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs