ITAC Assessment: AM0780
ITAC logo
ITAC Assessment: AM0780
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Custom plastic parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 108,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 2,580
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,377 1,587,760
kWh
Waste Disposal Costs
Water Disposal $18,000 12,000
Tgal
Solid Waste (non-haz) $14,400 24,000
lb
TOTAL YEARLY COSTS $184,777
RECOMMENDED SAVINGS* $20,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 3.6192: Use a less expensive method of waste removal $13,900 $4,745 $(-3,200.0)
(-32,300)
kWh
$17,100
-
Tgal
-
02 3.5315: Lease / purchase baler; sell cardboard to recycler $4,220 - - - $4,220
-
lb
03 2.4239: Eliminate or reduce compressed air usage $1,250 $3,080 $1,250
13,000
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,050 $50 $1,050
10,900
kWh
- -
05 2.7135: Install occupancy sensors $370 $600 $370
3,880
kWh
- -
06 2.7124: Make a practice of turning off lights when not needed $80 - $80
816
kWh
- -
TOTAL RECOMMENDED $20,870 $8,475 $(-450.0)
(-3,704)
kWh
$17,100
-
Tgal
$4,220
-
lb
TOTAL IMPLEMENTED $4,220 - - - $4,220
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs