ITAC Assessment: AM0779
ITAC logo
ITAC Assessment: AM0779
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Motors and control systems
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $100
M
to 500
M
# of Employees 260
Plant Area 481,000
ft2
Annual Production 325
pieces
Production Hrs. Annual 4,416
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $638,547 15,467,372
kWh
Electricity Demand $261,017 35,467
kW-mo/yr
Electricity Fees $20,337 -
Natural Gas $21,616 6,511
MMBtu
Waste Disposal Costs
Water Disposal $2,500 4,100
Tgal
TOTAL YEARLY COSTS $944,017
RECOMMENDED SAVINGS* $24,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,635

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,460 $16,000 $4,870
118,700
kWh
$2,590
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,000 $8,765 $3,240
79,000
kWh
$1,760
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,160 - $692
16,884
kWh
$2,468
-
kW-mo/yr
-
04 2.4314: Use synthetic lubricant $3,033 - $1,976
48,190
kWh
$1,057
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,795 $1,000 $1,830
44,600
kWh
$965
-
kW-mo/yr
-
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,880 $6,600 $(-380.0)
(-9,340)
kWh
- $2,260
-
Tgal
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,380 $3,300 $900
22,050
kWh
$480
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $110 $240 $110
2,680
kWh
- -
TOTAL RECOMMENDED $24,818 $35,905 $13,238
322,764
kWh
$9,320
-
kW-mo/yr
$2,260
-
Tgal
TOTAL IMPLEMENTED $11,635 $20,300 $7,600
185,350
kWh
$4,035
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs