Assessment Year | 2018 |
---|---|
Principal Product | Nameplates & labels |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 40 |
Plant Area |
30,000
ft2
|
Annual Production | 4,500,000
pieces
|
Production Hrs. Annual | 2,150
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $27,680 | 570,000 |
kWh
|
$0.049 |
Electricity Demand | $22,335 | 2,608 |
kW-mo/yr
|
$8.56 |
Electricity Fees | $1,519 | - |
|
- |
Natural Gas | $11,133 | 1,503 |
MMBtu
|
$7.41 |
TOTAL YEARLY COSTS | $62,667 | |||
RECOMMENDED SAVINGS* | $8,330 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,680 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $2,830 | $3,615 | - |
$2,830
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,090 | $5,860 |
$870
17,720
kWh
|
$830
-
kW-mo/yr
|
$(-120.0)
-
MMBtu
|
$510 | - | |
03 | 2.8121: Apply for tax-free status for energy purchases | $1,605 | $1,500 | - | - | - | - | $1,605 | |
04 | 2.7124: Make a practice of turning off lights when not needed | $730 | - |
$730
14,850
kWh
|
- | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $435 | $250 |
$220
4,500
kWh
|
$215
-
kW-mo/yr
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $485 | $320 |
$230
4,700
kWh
|
$255
-
kW-mo/yr
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $155 | $50 |
$80
1,690
kWh
|
$75
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $8,330 | $11,595 |
$2,130
43,460
kWh
|
$4,205
-
kW-mo/yr
|
$(-120.0)
-
MMBtu
|
$510 | $1,605 | ||
TOTAL IMPLEMENTED | $2,680 | $2,120 |
$530
10,890
kWh
|
$545
-
kW-mo/yr
|
- | - | $1,605 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs