ITAC Assessment: AM0757
ITAC logo
ITAC Assessment: AM0757
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Carbonated beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 110
Plant Area 372,180
ft2
Annual Production 23,000,000
units
Production Hrs. Annual 4,912
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $436,826 10,592,040
kWh
Electricity Demand $252,283 30,450
kW-mo/yr
Electricity Fees $33,273 -
Natural Gas $135,923 33,514
MMBtu
TOTAL YEARLY COSTS $858,305
RECOMMENDED SAVINGS* $179,409 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $153,989

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $65,410 $255 $65,410
1,587,647
kWh
- - -
02 2.4239: Eliminate or reduce compressed air usage $12,154 $1,140 $7,454
180,913
kWh
$4,700
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $25,420 $82,110 - $25,420
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,856 $3,000 $7,839
190,267
kWh
$5,017
-
kW-mo/yr
- -
05 2.8121: Apply for tax-free status for energy purchases $47,160 $136 - - $47,160 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,069 $28,981 $5,635
136,780
kWh
$3,077
-
kW-mo/yr
- $357
07 2.4231: Reduce the pressure of compressed air to the minimum required $7,340 $17 $4,770
115,670
kWh
$2,570
-
kW-mo/yr
- -
TOTAL RECOMMENDED $179,409 $115,639 $91,108
2,211,277
kWh
$40,784
-
kW-mo/yr
$47,160 $357
TOTAL IMPLEMENTED $153,989 $33,529 $91,108
2,211,277
kWh
$15,364
-
kW-mo/yr
$47,160 $357
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs