Assessment Year | 2018 |
---|---|
Principal Product | Church furniture, pews, tables |
NAICS | 321999: All Other Miscellaneous Wood Product Manufacturing |
SIC | 2531: Public Building and Related Furniture |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
120,000
ft2
|
Annual Production | 70
thousand feet
|
Production Hrs. Annual | 2,397
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $48,963 | 894,590 |
kWh
|
$0.055 | |
Electricity Demand | $45,305 | 5,119 |
kW-mo/yr
|
$8.85 | |
Electricity Fees | $2,697 | - |
|
- | |
Natural Gas | $6,718 | 837 |
MMBtu
|
$8.03 | |
Waste Disposal Costs | |||||
Water Usage | $3,064 | 22 |
Tgal
|
$139.27 | |
Water Disposal | $1,057 | 22 |
Tgal
|
$48.05 | |
TOTAL YEARLY COSTS | $107,804 | ||||
RECOMMENDED SAVINGS* | $13,889 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $11,919 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $6,550 | $9,100 | - |
$6,550
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,760 | $1,500 |
$1,550
28,200
kWh
|
$1,210
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,635 | $4,550 |
$920
16,670
kWh
|
$715
-
kW-mo/yr
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $780 | - |
$440
7,960
kWh
|
$340
-
kW-mo/yr
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $750 | $2,880 |
$750
13,500
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $630 | $6 |
$330
5,945
kWh
|
$300
-
kW-mo/yr
|
- | |
07 | 2.4314: Use synthetic lubricant | $440 | - |
$240
4,395
kWh
|
$200
-
kW-mo/yr
|
- | |
08 | 2.8123: Pay utility bills on time | $344 | - | - | - | $344 | |
TOTAL RECOMMENDED | $13,889 | $18,036 |
$4,230
76,670
kWh
|
$9,315
-
kW-mo/yr
|
$344 | ||
TOTAL IMPLEMENTED | $11,919 | $15,156 |
$2,800
50,815
kWh
|
$8,775
-
kW-mo/yr
|
$344 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs