ITAC Assessment: AM0749
ITAC logo
ITAC Assessment: AM0749
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Beef and pork processing
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $100
M
to 500
M
# of Employees 480
Plant Area 150,000
ft2
Annual Production 32,000,000
lb
Production Hrs. Annual 8,640
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $914,832 19,848,000
kWh
Electricity Demand $414,924 45,089
kW-mo/yr
Electricity Fees $38,502 -
Natural Gas $184,950 50,376
MMBtu
TOTAL YEARLY COSTS $1,553,208
RECOMMENDED SAVINGS* $273,385 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.2622: Replace existing chiller with high efficiency model $136,440 $167,100 $107,400
2,619,400
kWh
$29,040
-
kW-mo/yr
- - -
02 2.8112: Combine utility meters $65,915 $10,000 - $65,915
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $31,797 $45,252 - $31,797
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,000 $15,400 $11,495
280,430
kWh
$5,505
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $6,165 $40 $4,200
102,460
kWh
$1,965
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $9,336 $1,560 $3,073
74,994
kWh
- - $1,017 $5,246
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,109 $5,410 $2,180
53,180
kWh
$436
-
kW-mo/yr
$(-349.0) - $3,842
08 2.7111: Reduce illumination to minimum necessary levels $623 $140 $375
9,140
kWh
$124
-
kW-mo/yr
$124 - -
TOTAL RECOMMENDED $273,385 $244,902 $128,723
3,139,604
kWh
$134,782
-
kW-mo/yr
$(-225.0) $1,017 $9,088
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs