| Assessment Year | 2018 |
|---|---|
| Principal Product | Beef and pork processing |
| NAICS | 311611: Animal (except Poultry) Slaughtering |
| SIC | 2011: Meat Packing Plants |
| Sales Range | $100 M to 500M |
| # of Employees | 480 |
| Plant Area |
150,000
ft2
|
| Annual Production | 32,000,000
lb
|
| Production Hrs. Annual | 8,640
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $914,832 | 19,848,000 |
kWh
|
$0.046 |
| Electricity Demand | $414,924 | 45,089 |
kW-mo/yr
|
$9.20 |
| Electricity Fees | $38,502 | - |
|
- |
| Natural Gas | $184,950 | 50,376 |
MMBtu
|
$3.67 |
| TOTAL YEARLY COSTS | $1,553,208 | |||
| RECOMMENDED SAVINGS* | $273,385 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2622: Replace existing chiller with high efficiency model | $136,440 | $167,100 |
$107,400
2,619,400
kWh
|
$29,040
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.8112: Combine utility meters | $65,915 | $10,000 | - |
$65,915
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.3212: Optimize plant power factor | $31,797 | $45,252 | - |
$31,797
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,000 | $15,400 |
$11,495
280,430
kWh
|
$5,505
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,165 | $40 |
$4,200
102,460
kWh
|
$1,965
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7135: Install occupancy sensors | $9,336 | $1,560 |
$3,073
74,994
kWh
|
- | - | $1,017 | $5,246 | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,109 | $5,410 |
$2,180
53,180
kWh
|
$436
-
kW-mo/yr
|
$(-349.0) | - | $3,842 | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $623 | $140 |
$375
9,140
kWh
|
$124
-
kW-mo/yr
|
$124 | - | - | |
| TOTAL RECOMMENDED | $273,385 | $244,902 |
$128,723
3,139,604
kWh
|
$134,782
-
kW-mo/yr
|
$(-225.0) | $1,017 | $9,088 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs