ITAC Assessment: AM0746
ITAC logo
ITAC Assessment: AM0746
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Molded rubber products
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area 100,000
ft2
Annual Production 2,600,000
units
Production Hrs. Annual 6,024
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $344,258 6,098,227
kWh
Electricity Demand $104,809 16,412
kW-mo/yr
Electricity Fees $15,192 -
Natural Gas $196,892 28,025
MMBtu
TOTAL YEARLY COSTS $661,151
RECOMMENDED SAVINGS* $47,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,861

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,600 $13,500 $7,760
142,100
kWh
$1,840
-
kW-mo/yr
- - -
02 4.611: Begin a practice of predictive / preventative maintenance $13,690 $4,570 $6,730
123,300
kWh
$2,210
-
kW-mo/yr
- $4,750 -
03 2.1233: Analyze flue gas for proper air/fuel ratio $8,310 $1,350 - - $8,310
-
MMBtu
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,570 $13 $2,890
52,900
kWh
$680
-
kW-mo/yr
- - -
05 2.4239: Eliminate or reduce compressed air usage $2,460 $3,330 $2,460
45,100
kWh
- - - -
06 2.8123: Pay utility bills on time $2,256 - - - - - $2,256
07 2.2511: Insulate bare equipment $2,200 $890 - - $2,200
-
MMBtu
- -
08 2.4314: Use synthetic lubricant $1,780 - $1,340
24,530
kWh
$440
-
kW-mo/yr
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,795 $500 $1,450
26,600
kWh
$345
-
kW-mo/yr
- - -
10 2.7134: Use photocell controls $1,230 $625 $930
17,100
kWh
$300
-
kW-mo/yr
- - -
11 2.7135: Install occupancy sensors $540 $360 $540
9,900
kWh
- - - -
TOTAL RECOMMENDED $47,431 $25,138 $24,100
441,530
kWh
$5,815
-
kW-mo/yr
$10,510
-
MMBtu
$4,750 $2,256
TOTAL IMPLEMENTED $40,861 $21,435 $18,210
333,630
kWh
$5,135
-
kW-mo/yr
$10,510
-
MMBtu
$4,750 $2,256
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs