ITAC Assessment: AM0741
ITAC logo
ITAC Assessment: AM0741
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Structural steel fabrication
NAICS 332323: Ornamental and Architectural Metal Work Manufacturing
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 112,000
ft2
Annual Production 2,400,000
lb
Production Hrs. Annual 6,688
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,245 1,548,152
kWh
Electricity Demand $35,525 5,285
kW-mo/yr
Electricity Fees $1,930 -
TOTAL YEARLY COSTS $129,700
RECOMMENDED SAVINGS* $33,690 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,660 $24,700 $17,800
297,000
kWh
$3,860
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,260 $500 $8,540
142,210
kWh
$1,720
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,210 $10 $1,010
16,840
kWh
$200
-
kW-mo/yr
04 2.7111: Reduce illumination to minimum necessary levels $560 $160 $430
7,150
kWh
$130
-
kW-mo/yr
TOTAL RECOMMENDED $33,690 $25,370 $27,780
463,200
kWh
$5,910
-
kW-mo/yr
TOTAL IMPLEMENTED $12,030 $670 $9,980
166,200
kWh
$2,050
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs