ITAC Assessment: AM0737
ITAC logo
ITAC Assessment: AM0737
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Tortillas
NAICS 311830: Tortilla Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 95,000
ft2
Annual Production 22,000,000
lb
Production Hrs. Annual 3,096
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,593 2,114,100
kWh
Electricity Demand $53,753 5,948
kW-mo/yr
Electricity Fees $262 -
Natural Gas $196,250 45,826
MMBtu
TOTAL YEARLY COSTS $370,858
RECOMMENDED SAVINGS* $65,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,800 $35,500 $15,400
270,300
kWh
$3,400
-
kW-mo/yr
-
02 2.1135: Repair furnaces and oven doors so that they seal efficiently $18,400 - - - $18,400
-
MMBtu
03 2.6218: Turn off equipment when not in use $10,300 $1,940 $10,300
180,100
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $7,610 $120 $5,530
97,700
kWh
$2,080
-
kW-mo/yr
-
05 2.3212: Optimize plant power factor $4,070 $6,200 - $4,070
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,360 $710 $1,940
34,100
kWh
$420
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,210 $3,600 $1,810
31,800
kWh
$400
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $830 $2,000 $830
14,500
kWh
- -
09 2.4239: Eliminate or reduce compressed air usage $590 $475 $590
10,300
kWh
- -
TOTAL RECOMMENDED $65,170 $50,545 $36,400
638,800
kWh
$10,370
-
kW-mo/yr
$18,400
-
MMBtu
TOTAL IMPLEMENTED $42,600 $41,810 $19,980
350,700
kWh
$4,220
-
kW-mo/yr
$18,400
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs