ITAC Assessment: AM0733
ITAC logo
ITAC Assessment: AM0733
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Carbonated beverages, fruit juice, tea
NAICS 311421: Fruit and Vegetable Canning
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 1,424,000
ft2
Annual Production 18,000,000
units
Production Hrs. Annual 7,440
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $436,738 6,376,880
kWh
Electricity Demand $112,956 17,161
kW-mo/yr
Electricity Fees $17,938 -
Natural Gas $135,625 27,583
MMBtu
Waste Disposal Costs
Water Usage $399,394 105,281
Tgal
Water Disposal $532,862 105,281
Tgal
TOTAL YEARLY COSTS $1,635,513
RECOMMENDED SAVINGS* $76,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,825

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,560 $2,000 $13,450
217,000
kWh
$3,110
-
kW-mo/yr
- - - - -
02 3.4155: Meter waste water $16,425 $3,000 - - - - $7,300
-
Tgal
$9,125
-
Tgal
-
03 2.8121: Apply for tax-free status for energy purchases $32,880 $15,000 - - $6,580 - - - $26,300
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,370 $10 $2,730
44,000
kWh
$640
-
kW-mo/yr
- - - - -
05 2.7111: Reduce illumination to minimum necessary levels $2,040 - $1,430
23,100
kWh
$610
-
kW-mo/yr
- - - - -
06 2.2511: Insulate bare equipment $260 $271 - - - $260
-
MMBtu
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $5,290 $1,720 - - - $5,290
-
MMBtu
- - -
TOTAL RECOMMENDED $76,825 $22,001 $17,610
284,100
kWh
$4,360
-
kW-mo/yr
$6,580 $5,550
-
MMBtu
$7,300
-
Tgal
$9,125
-
Tgal
$26,300
TOTAL IMPLEMENTED $76,825 $22,001 $17,610
284,100
kWh
$4,360
-
kW-mo/yr
$6,580 $5,550
-
MMBtu
$7,300
-
Tgal
$9,125
-
Tgal
$26,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs