ITAC Assessment: AM0732
ITAC logo
ITAC Assessment: AM0732
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Milk, tea, juices
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 198
Plant Area 115,000
ft2
Annual Production 56,000
Tgal
Production Hrs. Annual 7,440
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $532,890 16,920,558
kWh
Electricity Demand $301,157 32,471
kW-mo/yr
Electricity Fees $24,633 -
Natural Gas $124,798 34,037
MMBtu
Waste Disposal Costs
Water Usage $540,740 94,563
Tgal
Water Disposal $228,329 77,599
Tgal
TOTAL YEARLY COSTS $1,752,547
RECOMMENDED SAVINGS* $28,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,202

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 3.4113: Treat and reuse rinse waters $19,732 $5,800 $10,250
256,200
kWh
- - $6,263
-
Tgal
$3,219
-
Tgal
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,470 $6,750 $2,550
63,280
kWh
$920
-
kW-mo/yr
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,610 $1,255 - - $2,610
-
MMBtu
- -
04 2.2511: Insulate bare equipment $2,410 $500 $1,770
44,200
kWh
$640
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $28,222 $14,305 $14,570
363,680
kWh
$1,560
-
kW-mo/yr
$2,610
-
MMBtu
$6,263
-
Tgal
$3,219
-
Tgal
TOTAL IMPLEMENTED $23,202 $12,550 $12,800
319,480
kWh
$920
-
kW-mo/yr
- $6,263
-
Tgal
$3,219
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs