ITAC Assessment: AM0720
ITAC logo
ITAC Assessment: AM0720
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Corrugated shipping containers and boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 300,000
ft2
Annual Production 96,000
ton
Production Hrs. Annual 7,224
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $581,641 8,468,160
kWh
Electricity Demand $110,253 18,249
kW-mo/yr
Electricity Fees $33,607 -
Natural Gas $343,059 66,939
MMBtu
TOTAL YEARLY COSTS $1,068,560
RECOMMENDED SAVINGS* $245,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $227,074

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.8118: Check for accuracy of utility / power meters $189,624 - - - $94,812 $94,812
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,440 $2,000 $8,800
127,500
kWh
$1,640
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,170 $800 $9,410
136,400
kWh
$1,760
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,240 - - $10,240
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,389 - $7,760
112,459
kWh
$2,629
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,600 $5,030 $4,280
62,000
kWh
$1,320
-
kW-mo/yr
- -
07 2.4314: Use synthetic lubricant $5,856 - $4,374
63,393
kWh
$1,482
-
kW-mo/yr
- -
08 2.4239: Eliminate or reduce compressed air usage $760 $250 $760
11,010
kWh
- - -
09 2.7135: Install occupancy sensors $970 $280 $970
14,100
kWh
- - -
TOTAL RECOMMENDED $245,049 $8,360 $36,354
526,862
kWh
$19,071
-
kW-mo/yr
$94,812 $94,812
TOTAL IMPLEMENTED $227,074 $7,830 $22,490
325,900
kWh
$14,960
-
kW-mo/yr
$94,812 $94,812