ITAC Assessment: AM0677
ITAC logo
ITAC Assessment: AM0677
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Rough terrain forklifts
NAICS 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $50
M
to 100
M
# of Employees 174
Plant Area 140,000
ft2
Annual Production 984
pieces
Production Hrs. Annual 4,020
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,142 2,105,921
kWh
Electricity Demand $29,435 6,312
kW-mo/yr
Electricity Fees $8,772 -
Natural Gas $23,147 2,682
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,797 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,992

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,570 $130,700 $20,920
294,600
kWh
$2,650
-
kW-mo/yr
- - -
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $22,000 $1,140 $22,000
310,500
kWh
- - - -
03 2.7135: Install occupancy sensors $3,460 $7,200 $3,460
48,710
kWh
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,805 $23 $2,436
34,734
kWh
$369
-
kW-mo/yr
- - -
05 2.8121: Apply for tax-free status for energy purchases $10,875 $3,000 - - $2,175 - $8,700
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,433 $469 $445
6,264
kWh
$29
-
kW-mo/yr
- $959 -
07 2.7122: Disconnect ballasts $654 $79 $513
7,233
kWh
$141
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $64,797 $142,611 $49,774
702,041
kWh
$3,189
-
kW-mo/yr
$2,175 $959 $8,700
TOTAL IMPLEMENTED $61,992 $142,588 $47,338
667,307
kWh
$2,820
-
kW-mo/yr
$2,175 $959 $8,700
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs