Assessment Year | 2014 |
---|---|
Principal Product | Foam plates and bowls |
NAICS | 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
330,000
ft2
|
Annual Production | 2,500,000,000
pieces
|
Production Hrs. Annual | 8,688
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,166,601 | 17,285,777 |
kWh
|
$0.067 |
Electricity Demand | $106,505 | 28,643 |
kW-mo/yr
|
$3.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $155,475 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $155,475 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $59,505 | $4,370 |
$55,770
845,000
kWh
|
$3,735
-
kW-mo/yr
|
|
02 | 2.4322: Use or replace with energy efficient substitutes | $39,640 | $20,000 |
$37,150
562,900
kWh
|
$2,490
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $34,810 | $18,000 |
$32,620
494,200
kWh
|
$2,190
-
kW-mo/yr
|
|
04 | 2.4314: Use synthetic lubricant | $14,780 | - |
$13,770
208,700
kWh
|
$1,010
-
kW-mo/yr
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,250 | $4,550 |
$4,860
73,700
kWh
|
$390
-
kW-mo/yr
|
|
06 | 2.7135: Install occupancy sensors | $880 | $1,770 |
$830
12,500
kWh
|
$50
-
kW-mo/yr
|
|
07 | 2.2511: Insulate bare equipment | $610 | $30 |
$570
8,600
kWh
|
$40
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $155,475 | $48,720 |
$145,570
2,205,600
kWh
|
$9,905
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $155,475 | $48,720 |
$145,570
2,205,600
kWh
|
$9,905
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs