| Assessment Year | 2014 |
|---|---|
| Principal Product | Lime Processing |
| NAICS | 327410: Lime Manufacturing |
| SIC | 3274: Lime |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
47,916,000
ft2
|
| Annual Production | 300,000
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $859,399 | 19,670,155 |
kWh
|
$0.044 |
| Electricity Demand | $279,012 | 41,095 |
kW-mo/yr
|
$6.79 |
| Electricity Fees | $28,212 | - |
|
- |
| Natural Gas | $1,073,145 | 149,400 |
MMBtu
|
$7.18 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $89,905 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $35,655 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $46,500 | $51,870 | - |
$46,500
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,030 | $3,600 |
$13,800
321,600
kWh
|
$2,990
-
kW-mo/yr
|
$240 | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,750 | $12 |
$5,920
137,700
kWh
|
$1,830
-
kW-mo/yr
|
- | - | |
| 04 | 2.7132: Install timers on light switches in little used areas | $7,770 | $1,200 |
$7,300
170,000
kWh
|
- | $250 | $220 | |
| 05 | 2.4313: Provide proper maintenance of motor driven equipment | $5,260 | - |
$3,630
84,410
kWh
|
$1,630
-
kW-mo/yr
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,970 | $4,550 |
$4,085
95,010
kWh
|
$885
-
kW-mo/yr
|
- | - | |
| 07 | 2.7135: Install occupancy sensors | $625 | $870 |
$625
14,520
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $89,905 | $62,102 |
$35,360
823,240
kWh
|
$53,835
-
kW-mo/yr
|
$490 | $220 | ||
| TOTAL IMPLEMENTED | $35,655 | $10,220 |
$29,440
685,540
kWh
|
$5,505
-
kW-mo/yr
|
$490 | $220 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs