Assessment Year | 2014 |
---|---|
Principal Product | All terrain oil industry vehicles |
NAICS | 336120: Heavy Duty Truck Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
56,000
ft2
|
Annual Production | 120
pieces
|
Production Hrs. Annual | 3,175
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $90,672 | 1,581,360 |
kWh
|
$0.057 |
Electricity Demand | $76,212 | 6,887 |
kW-mo/yr
|
$11.07 |
Electricity Fees | $(-3,843.0) | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,998 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,480 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,960 | $24,700 |
$8,200
143,000
kWh
|
$5,760
-
kW-mo/yr
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,000 | - | - |
$9,000
-
kW-mo/yr
|
|
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $5,730 | - |
$5,730
100,000
kWh
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,790 | $55 |
$2,810
49,000
kWh
|
$1,980
-
kW-mo/yr
|
|
05 | 2.7124: Make a practice of turning off lights when not needed | $3,445 | - |
$3,445
60,135
kWh
|
- | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $1,158 | $4,500 |
$495
6,005
kWh
|
$663
-
kW-mo/yr
|
|
07 | 2.7145: Install skylights | $915 | $4,140 |
$915
15,955
kWh
|
- | |
TOTAL RECOMMENDED | $38,998 | $33,395 |
$21,595
374,095
kWh
|
$17,403
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $24,480 | $24,755 |
$16,740
292,000
kWh
|
$7,740
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs