Assessment Year | 2014 |
---|---|
Principal Product | Pails and containers |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
80,000
ft2
|
Annual Production | 30,660,000
pieces
|
Production Hrs. Annual | 8,294
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $996,936 | 24,376,800 |
kWh
|
$0.041 |
Electricity Demand | $468,965 | 49,663 |
kW-mo/yr
|
$9.44 |
Electricity Fees | $18,767 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $184,730 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $160,397 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $72,800 | $26,790 |
$50,730
1,240,340
kWh
|
$22,070
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $44,492 | $23,175 |
$30,613
748,486
kWh
|
$13,321
-
kW-mo/yr
|
- | - | $(-95.0) | $653 | |
03 | 2.8123: Pay utility bills on time | $18,665 | - | - | - | $18,665 | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $11,185 | $20 |
$7,766
189,889
kWh
|
$3,419
-
kW-mo/yr
|
- | - | - | - | |
05 | 3.4155: Meter waste water | $10,350 | $2,650 | - | - | - |
$10,350
-
Tgal
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,178 | $3,000 |
$6,398
156,434
kWh
|
$2,780
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4314: Use synthetic lubricant | $6,010 | - |
$3,214
78,584
kWh
|
$2,796
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,535 | $18,000 |
$4,535
110,937
kWh
|
- | - | - | - | - | |
09 | 2.7111: Reduce illumination to minimum necessary levels | $3,018 | - |
$2,108
51,539
kWh
|
$910
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.7211: Clean and maintain refrigerant condensers and towers | $2,045 | $20 |
$1,425
34,834
kWh
|
$620
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $838 | $459 |
$113
2,756
kWh
|
$46
-
kW-mo/yr
|
- | - | $679 | - | |
12 | 2.7124: Make a practice of turning off lights when not needed | $650 | $90 |
$318
6,500
kWh
|
$332
-
kW-mo/yr
|
- | - | - | - | |
13 | 2.7135: Install occupancy sensors | $544 | $980 |
$544
13,274
kWh
|
- | - | - | - | - | |
14 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $420 | - |
$250
6,185
kWh
|
$170
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $184,730 | $75,184 |
$108,014
2,639,758
kWh
|
$46,464
-
kW-mo/yr
|
$18,665 |
$10,350
-
Tgal
|
$584 | $653 | ||
TOTAL IMPLEMENTED | $160,397 | $54,534 |
$97,907
2,392,513
kWh
|
$42,588
-
kW-mo/yr
|
$18,665 | - | $584 | $653 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs