ITAC Assessment: AM0656
ITAC logo
ITAC Assessment: AM0656
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Aloe vera lotions and sunscreens
NAICS 325620: Toilet Preparation Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $100
M
to 500
M
# of Employees 160
Plant Area 130,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 5,300
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $325,457 7,064,225
kWh
Electricity Demand $201,159 13,365
kW-mo/yr
Electricity Fees $10,054 -
Natural Gas $147,516 21,144
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $183,809 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $114,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $103,415 - - - $64,140 - - $39,275
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $28,950 $3,000 $22,220
419,320
kWh
$6,730
-
kW-mo/yr
- - - -
03 2.4239: Eliminate or reduce compressed air usage $17,977 $20 $12,780
241,140
kWh
$5,197
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,540 $15,500 $8,850
167,036
kWh
$2,690
-
kW-mo/yr
- - - -
05 2.4239: Eliminate or reduce compressed air usage $8,409 $190 $6,452
121,730
kWh
$1,957
-
kW-mo/yr
- - - -
06 2.2113: Repair or replace steam traps $7,090 $1,710 - - - $7,090
-
MMBtu
- -
07 2.7135: Install occupancy sensors $4,030 $910 $4,030
76,000
kWh
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,080 $420 $130
2,505
kWh
$25
-
kW-mo/yr
- - $925 -
09 2.6218: Turn off equipment when not in use $560 $250 $560
10,596
kWh
- - - - -
10 2.7124: Make a practice of turning off lights when not needed $383 - $294
5,539
kWh
$89
-
kW-mo/yr
- - - -
11 2.7111: Reduce illumination to minimum necessary levels $375 $265 $288
5,427
kWh
$87
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $183,809 $22,265 $55,604
1,049,293
kWh
$16,775
-
kW-mo/yr
$64,140 $7,090
-
MMBtu
$925 $39,275
TOTAL IMPLEMENTED $114,955 $15,500 $8,850
167,036
kWh
$2,690
-
kW-mo/yr
$64,140 - - $39,275
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs