ITAC Assessment: AM0645
ITAC logo
ITAC Assessment: AM0645
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product modular and conventional telephone station apparatus
NAICS 334290: Other Communications Equipment Manufacturing
SIC 3669: Communications Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 250,000
ft2
Annual Production 224,000,000
pieces
Production Hrs. Annual 8,496
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,263 8,218,800
kWh
Electricity Demand $121,724 17,868
kW-mo/yr
Electricity Fees $186,600 -
Natural Gas $5,942 1,165
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,295 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,745

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.7232: Replace existing hvac unit with high efficiency model $9,885 $63,000 $1,700
99,800
kWh
$4,285
-
kW-mo/yr
- $3,900
02 2.7111: Reduce illumination to minimum necessary levels $2,290 $750 $1,350
79,345
kWh
$940
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $570 $60 $340
19,930
kWh
$230
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,070 - - $4,070
-
kW-mo/yr
- -
05 3.4116: Meter recycled water (to reduce sewer charges) $480 $1,000 - - $480
-
Tgal
-
TOTAL RECOMMENDED $17,295 $64,810 $3,390
199,075
kWh
$9,525
-
kW-mo/yr
$480
-
Tgal
$3,900
TOTAL IMPLEMENTED $12,745 $63,810 $3,390
199,075
kWh
$5,455
-
kW-mo/yr
- $3,900
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs