| Assessment Year | 2013 |
|---|---|
| Principal Product | modular and conventional telephone station apparatus |
| NAICS | 334290: Other Communications Equipment Manufacturing |
| SIC | 3669: Communications Equipment, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
250,000
ft2
|
| Annual Production | 224,000,000
pieces
|
| Production Hrs. Annual | 8,496
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $141,263 | 8,218,800 |
kWh
|
$0.017 |
| Electricity Demand | $121,724 | 17,868 |
kW-mo/yr
|
$6.81 |
| Electricity Fees | $186,600 | - |
|
- |
| Natural Gas | $5,942 | 1,165 |
MMBtu
|
$5.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,295 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,745 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7232: Replace existing hvac unit with high efficiency model | $9,885 | $63,000 |
$1,700
99,800
kWh
|
$4,285
-
kW-mo/yr
|
- | $3,900 | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $2,290 | $750 |
$1,350
79,345
kWh
|
$940
-
kW-mo/yr
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $570 | $60 |
$340
19,930
kWh
|
$230
-
kW-mo/yr
|
- | - | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,070 | - | - |
$4,070
-
kW-mo/yr
|
- | - | |
| 05 | 3.4116: Meter recycled water (to reduce sewer charges) | $480 | $1,000 | - | - |
$480
-
Tgal
|
- | |
| TOTAL RECOMMENDED | $17,295 | $64,810 |
$3,390
199,075
kWh
|
$9,525
-
kW-mo/yr
|
$480
-
Tgal
|
$3,900 | ||
| TOTAL IMPLEMENTED | $12,745 | $63,810 |
$3,390
199,075
kWh
|
$5,455
-
kW-mo/yr
|
- | $3,900 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs