Assessment Year | 2013 |
---|---|
Principal Product | Plastic drums |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
90,000
ft2
|
Annual Production | 1,450,000
pieces
|
Production Hrs. Annual | 8,688
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $582,514 | 15,892,000 |
kWh
|
$0.037 |
Electricity Demand | $271,294 | 28,866 |
kW-mo/yr
|
$9.40 |
Electricity Fees | $17,938 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,929 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,529 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,680 | $500 |
$6,830
243,900
kWh
|
$3,850
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,550 | $18 |
$4,830
172,500
kWh
|
$2,720
-
kW-mo/yr
|
- | |
03 | 2.8123: Pay utility bills on time | $7,089 | - | - | - | $7,089 | |
04 | 2.2615: Clean condenser tubes | $6,020 | $7,540 |
$2,860
102,200
kWh
|
$3,160
-
kW-mo/yr
|
- | |
05 | 2.3212: Optimize plant power factor | $5,960 | $13,780 | - |
$5,960
-
kW-mo/yr
|
- | |
06 | 2.4314: Use synthetic lubricant | $4,190 | - |
$2,680
95,640
kWh
|
$1,510
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $1,440 | $1,840 |
$1,440
51,540
kWh
|
- | - | |
TOTAL RECOMMENDED | $42,929 | $23,678 |
$18,640
665,780
kWh
|
$17,200
-
kW-mo/yr
|
$7,089 | ||
TOTAL IMPLEMENTED | $35,529 | $8,058 |
$17,200
614,240
kWh
|
$11,240
-
kW-mo/yr
|
$7,089 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs