Assessment Year | 2012 |
---|---|
Principal Product | Corrugated boxes |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 68 |
Plant Area |
35,000
ft2
|
Annual Production | 144,000
thousand feet
|
Production Hrs. Annual | 3,030
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $107,006 | 1,386,900 |
kWh
|
$0.077 |
Electricity Demand | $17,362 | 4,341 |
kW-mo/yr
|
$4.00 |
Electricity Fees | $2,250 | - |
|
- |
Natural Gas | $1,284 | 146 |
MMBtu
|
$8.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,280 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7145: Install skylights | $5,900 | $6,720 |
$5,900
70,000
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,745 | $605 |
$300
4,000
kWh
|
$25
-
kW-mo/yr
|
$1,420 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,540 | $500 |
$1,300
15,700
kWh
|
$240
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $730 | $425 |
$730
9,900
kWh
|
- | - | - | |
05 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $600 | - | - | - | - | $600 | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $440 | - | - |
$440
-
kW-mo/yr
|
- | - | |
07 | 2.7124: Make a practice of turning off lights when not needed | $190 | - |
$140
1,900
kWh
|
$50
-
kW-mo/yr
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $135 | $13 |
$135
1,600
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $11,280 | $8,263 |
$8,505
103,100
kWh
|
$755
-
kW-mo/yr
|
$1,420 | $600 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs