Assessment Year | 2012 |
---|---|
Principal Product | Pipe wrapping tapes, coatings |
NAICS | 339991: Gasket, Packing, and Sealing Device Manufacturing |
SIC | 2891: Adhesives and Sealants |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
110,000
ft2
|
Annual Production | 1,618,500
lb
|
Production Hrs. Annual | 2,116
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $311,301 | 4,172,892 |
kWh
|
$0.075 |
Electricity Demand | $79,221 | 11,544 |
kW-mo/yr
|
$6.86 |
Electricity Fees | $29,135 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,015 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $900 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $8,320 | $16,340 | - |
$8,320
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,915 | $1,000 |
$400
5,300
kWh
|
$45
-
kW-mo/yr
|
$1,470 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $900 | $3,110 |
$600
8,000
kWh
|
$300
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $795 | $20 |
$530
7,000
kWh
|
$265
-
kW-mo/yr
|
- | |
05 | 2.7145: Install skylights | $410 | $880 |
$410
7,200
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $325 | $20 |
$160
2,155
kWh
|
$165
-
kW-mo/yr
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $175 | $200 |
$115
2,155
kWh
|
$60
-
kW-mo/yr
|
- | |
08 | 2.7134: Use photocell controls | $175 | $100 |
$115
1,565
kWh
|
$60
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $13,015 | $21,670 |
$2,330
33,375
kWh
|
$9,215
-
kW-mo/yr
|
$1,470 | ||
TOTAL IMPLEMENTED | $900 | $3,110 |
$600
8,000
kWh
|
$300
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs