Assessment Year | 2012 |
---|---|
Principal Product | storage tanks |
NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
SIC | 3398: Metal Heat Treating |
Sales Range | $10 M to 50M |
# of Employees | 205 |
Plant Area |
110,000
ft2
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 3,146
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $138,519 | 1,457,403 |
kWh
|
$0.095 |
Electricity Demand | $66,002 | 13,101 |
kW-mo/yr
|
$5.04 |
Electricity Fees | $15,735 | - |
|
- |
Fuel Oil #1 | $511,050 | 19,079 |
MMBtu
|
$26.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $131,989 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $125,414 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #1 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $80,070 | $66,160 |
$(-413,250.0)
(-5,660,930)
kWh
|
$(-17,730.0)
-
kW-mo/yr
|
- |
$511,050
-
MMBtu
|
- | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $30,000 | $2,320 | - | - | - | - | $30,000 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,750 | $1,000 |
$3,500
47,900
kWh
|
$1,250
-
kW-mo/yr
|
- | - | - | |
04 | 2.3212: Optimize plant power factor | $4,730 | $9,440 | - |
$4,730
-
kW-mo/yr
|
- | - | - | |
05 | 2.7134: Use photocell controls | $2,890 | $260 |
$2,300
31,500
kWh
|
$590
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,080 | $1,000 |
$1,530
21,000
kWh
|
$550
-
kW-mo/yr
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,040 | $500 |
$1,440
19,700
kWh
|
$600
-
kW-mo/yr
|
- | - | - | |
08 | 2.8123: Pay utility bills on time | $1,684 | - | - | - | $1,684 | - | - | |
09 | 2.7124: Make a practice of turning off lights when not needed | $1,655 | - |
$1,015
13,900
kWh
|
$640
-
kW-mo/yr
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,180 | $3,110 |
$870
11,890
kWh
|
$310
-
kW-mo/yr
|
- | - | - | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $720 | $20 |
$540
7,400
kWh
|
$180
-
kW-mo/yr
|
- | - | - | |
12 | 2.6218: Turn off equipment when not in use | $190 | - |
$190
2,560
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $131,989 | $83,810 |
$(-401,865.0)
(-5,505,080)
kWh
|
$(-8,880.0)
-
kW-mo/yr
|
$1,684 |
$511,050
-
MMBtu
|
$30,000 | ||
TOTAL IMPLEMENTED | $125,414 | $74,370 |
$(-403,070.0)
(-5,521,540)
kWh
|
$(-14,250.0)
-
kW-mo/yr
|
$1,684 |
$511,050
-
MMBtu
|
$30,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #1 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs