ITAC Assessment: AM0600
ITAC logo
ITAC Assessment: AM0600
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Envelopes
NAICS 322230: Stationery Product Manufacturing
SIC 2677: Envelopes
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 315,000
ft2
Annual Production 4,800,000,000
pieces
Production Hrs. Annual 7,248
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,722,467 21,910,000
kWh
Electricity Demand $269,953 39,516
kW-mo/yr
Electricity Fees $52,580 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $113,629

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $50,712 $92,850 - $50,712
-
kW-mo/yr
-
02 2.8123: Pay utility bills on time $19,975 - - - $19,975
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $14,800 $900 $12,900
163,798
kWh
$1,900
-
kW-mo/yr
-
04 2.6218: Turn off equipment when not in use $11,000 - $11,000
140,000
kWh
- -
05 2.4314: Use synthetic lubricant $10,722 - $9,352
118,378
kWh
$1,370
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,920 $680 $3,420
43,300
kWh
$500
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $2,500 $1,700 $2,500
32,000
kWh
- -
TOTAL RECOMMENDED $113,629 $96,130 $39,172
497,476
kWh
$54,482
-
kW-mo/yr
$19,975
TOTAL IMPLEMENTED $113,629 $96,130 $39,172
497,476
kWh
$54,482
-
kW-mo/yr
$19,975
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs