ITAC Assessment: AM0598
ITAC logo
ITAC Assessment: AM0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Oil field equipment, military missile tubes
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 235
Plant Area 126,000
ft2
Annual Production 5,200
pieces
Production Hrs. Annual 8,688
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $434,696 5,620,000
kWh
Electricity Demand $79,308 13,800
kW-mo/yr
Electricity Fees $14,298 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $872,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $205,509

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.132: Purchase new equipment to reduce material use / cost $665,600 $1,000,000 - - - $665,600
02 2.7232: Replace existing hvac unit with high efficiency model $176,800 $119,000 $66,700
834,000
kWh
$6,600
-
kW-mo/yr
$103,500 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,540 $12,900 $10,500
131,000
kWh
$1,040
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,800 $1,000 $8,000
100,000
kWh
$800
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $6,800 $3,800 $6,800
84,700
kWh
- - -
06 2.6218: Turn off equipment when not in use $1,780 - $1,780
22,300
kWh
- - -
07 2.7124: Make a practice of turning off lights when not needed $1,220 $75 $1,180
14,700
kWh
$40
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $349 $160 $77
970
kWh
$6
-
kW-mo/yr
$266 -
TOTAL RECOMMENDED $872,889 $1,136,935 $95,037
1,187,670
kWh
$8,486
-
kW-mo/yr
$103,766 $665,600
TOTAL IMPLEMENTED $205,509 $136,935 $93,257
1,165,370
kWh
$8,486
-
kW-mo/yr
$103,766 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs